<address id="zv7bf"></address>
<var id="zv7bf"></var>
<var id="zv7bf"><strike id="zv7bf"></strike></var>
<var id="zv7bf"></var>
<cite id="zv7bf"></cite>
<var id="zv7bf"><strike id="zv7bf"></strike></var>
<var id="zv7bf"></var>
<var id="zv7bf"><strike id="zv7bf"><listing id="zv7bf"></listing></strike></var>
<menuitem id="zv7bf"></menuitem><menuitem id="zv7bf"></menuitem>
<menuitem id="zv7bf"><dl id="zv7bf"><progress id="zv7bf"></progress></dl></menuitem><var id="zv7bf"></var>
<var id="zv7bf"><video id="zv7bf"><listing id="zv7bf"></listing></video></var>
<var id="zv7bf"></var>
<var id="zv7bf"><strike id="zv7bf"><listing id="zv7bf"></listing></strike></var><var id="zv7bf"><strike id="zv7bf"></strike></var><cite id="zv7bf"><strike id="zv7bf"></strike></cite>
<var id="zv7bf"></var>
<var id="zv7bf"><strike id="zv7bf"></strike></var>
<var id="zv7bf"><strike id="zv7bf"></strike></var><var id="zv7bf"></var>
<var id="zv7bf"></var>
山东天安防雷技术有限公司

设备安装及注意事项要知道

2020-06-02

避雷针大家都不陌生,是用来保护建筑物、高大树木等避免雷击的装置,一般我们会在高楼建筑上看到。那么对于避雷针的安装步骤及注意事项您知道多少呢?今天就由山东避雷针的小编为您讲一讲。

避雷针安装及注意事项


避雷针安装:

将支座钢板固定在预埋的地脚螺栓上,焊上一块肋板,再将避雷针立起,找直、找正后,进行点焊,然后加以校正,焊上其他三块胁板。较后将引下线焊接在底板上,清除药皮刷防锈漆。

支架安装角钢支架应有燕尾,其埋注深度不小于100mm,扁钢和圆钢支架埋深不小于80mm。所有支架必须牢固,灰浆饱满,横平竖直。防雷装置的各种支架顶部一般应距建筑物表面100mm;接地干线支架其顶部应距墙面20mm.支架水平间距不大于1m(混凝土支座不大于2m);垂直间距不大于1.5m。各间距应均匀,允许偏差30mm。转角处两边的支架距转角中心不大于250mm。支架应平直。水平度每2m检查段允许偏差3/1000,垂直度每3m检查段允许偏差2/1000;但全长偏差不得大于10mm。支架等铁件均应做防腐处理。埋注支架所有的水泥砂浆,其配合比不应低于1:2。

避雷针制作与安装注意的质量问题:

焊接处一不饱满,焊药处理不干净,漏刷防锈漆。应及时予以补焊,将药皮敲掉,刷上防锈漆。针体弯曲,安装的垂直度超出允许偏差。应将针体重新调直,符合要求后再安装独立避雷针及其接地装置与道路或建筑物的出入口保护距离不符合规定。其距离应大于3m,当小于3m时,应采取均压措施或铺设卵石或沥青地接地装置:GB50057建筑物防雷设计规范里要求:接地装置人工接地体采用角钢,钢管,圆钢,埋于土壤中的人工水平接地体采用扁钢或圆钢,圆钢直径不小于10mm,扁钢截面积不小于100平方毫米,厚度不小于4mm,角钢厚度不小于4MM人工垂直接地体长度为2.5m,距离宜为5M,埋深不小于0.5m。

联系方式

联系人:张经理

联系电话:4000900268

邮箱:jntianan@163.com

传真:0531-88912806

地址:济南市高新区新泺大街3003号

网址:www.www.czbeut.com

Powered By guangsou(5/27 22:09)

返回顶部
  • 电话
  • 地图
  • 分享
  • 留言
盈彩